Arturo is watching his men pour and smooth. I guess if he falls in he won't get glued in place.
Two days after it hardened a waterproof coating painted on, then another waterproofing material, and finally this composite material Nacho said is to protect the wall from the dirt.
Framing is almost ready for it's first inspection. The nails on this roof have to be approved before framing can begin for the second floor.
DESIGN DECISIONS
It's not a wall, it's a canvas. Even though I designed what this surface would look like, I never figured out how the edge of the roof would meet up with the horizontal facia. This detail has to be resolved soon now and it's also opened up a lot of questions that I have been thinking about this week. It's suppose to be a stark, minimalist house, but I've got two sconces, a trellis, and a planter along this wall. Did I over do it? The facia edge issue before me now sets the tone for the rest of the house. Suggestions anyone?
No comments:
Post a Comment