Friday, February 13, 2009

Drainage Test and More

This week saw some heavy rains where the drainage plan and construction was put to the test. Even though the ground was graded to follow a drainage plan there was still some puddling. Mateo suggested we put in another drain in this corner where the water is puddling. There is a drainage pipe below.The rainy weather also shows the reason for the house sited on the lot the way it was -- the great room has views of downtown . . . and on the other side of the room it has views of the San Gabriel Mountains.
Framing also started on the garage shown below. I don't know if I've mentioned it before but the tall shaft is for an elevator. It took me a long time to figure that one out. The ideal position for a garage is for it to be next to the house. To do that on this site would require extensive and expensive retaining walls for a long driveway. After two years it dawned on me that for a quarter of the cost I could construct an elevator. However at this time it is not in the budget. Additionally, although with the windows it looks like there is a room above the garage, actually there is not.

Just in time for the rains, roofing materials went on the garage. The final roof will be a standing seam metal roof.
Inside the house I changed the original idea for flooring that was illustrated in a previous post. Instead I chose this black bamboo wood shown in the master bedroom. This room is now completely finished.
Another view of the status of the exterior.