The plumbing began to be installed this week.
The upstairs fireplace was installed as well. It is designed to be open between the den and the master bedroom.
It was a blank canvas, a vacant hilltop lot, time to test my design sensibilities and professional calling. After eight years, two public hearings, designs and re-designs, finally the construction log . . . (NOTE: The plans are under the 2008 entries in July, click to enlarge images.)
The plumbing began to be installed this week.
The upstairs fireplace was installed as well. It is designed to be open between the den and the master bedroom.
No comments:
Post a Comment